This is a BETA site, which is live in tandem with our legacy site.

Installations

Residential Equipment

New furnace?  Water Hearer? AC Unit? Most equipment installations require permits.

Industrial Equipment

Brewery Tanks, built in refrigeration & cooking equipment all require permits.  The staff will need to see the specifications for the equipment, assure that the equipment is rated for earthquakes, and make sure the flooring under the equipment provides proper support.  New equipment can also trigger new fire prevention systems.

Installation Handouts

NameDateDownload
Appliances Installed in Garages – Protection ofJune 11, 2019 PDF (335 KB)
Building Projects Requiring a PermitMay 6, 2019 PDF (186 KB)
Commercial Grading & Drainage InformationJune 11, 2019 PDF (183 KB)
Commercial Handrail InformationJune 11, 2019 PDF (220 KB)
Commercial Permit ChecklistJune 11, 2019 PDF (199 KB)
Commercial Tenant Improvement InformationJune 11, 2019 PDF (237 KB)
Encroachment Permit Info SheetMay 21, 2019 PDF (191 KB)
Furnace and A/C Replacement RequirementsJune 11, 2019 PDF (182 KB)
Gas Pressure Tests – InformationJune 11, 2019 PDF (188 KB)
Guidelines for Plan Organization and Sheet IdentificationJune 11, 2019 PDF (96 KB)
How to Get a Building PermitJune 11, 2019 PDF (218 KB)
New Non-Residential Lighting Testing Now RequiredJune 12, 2019 PDF (53 KB)
New Regulations to allow the use of PEXJune 12, 2019 PDF (93 KB)
Permit Application-ContractorJune 11, 2019 PDF (44 KB)
Permit Application-Owner/BuilderJune 11, 2019 PDF (150 KB)
Permit Worksheet Contractor OnlyJune 12, 2019 PDF (143 KB)
Permit Worksheet Owner/BuilderJune 12, 2019 PDF (143 KB)
Photovoltaic RequirementsJune 12, 2019 PDF (81 KB)
Projects the Require a Building PermitJuly 26, 2019 PDF (186 KB)
Required Building PermitsJune 12, 2019 PDF (297 KB)
Smoke & Carbon Monoxide Alarm Self Verification FormJune 12, 2019 PDF (108 KB)
Soils Report InformationJune 12, 2019 PDF (107 KB)
Special Inspection and Testing ProcedureJune 12, 2019 PDF (357 KB)
Special Inspection Approved AgenciesJune 12, 2019 PDF (121 KB)
Special Inspector ApplicationJune 12, 2019 PDF (116 KB)
Tankless Water Heater HandoutJune 12, 2019 PDF (106 KB)
Water Use Efficiency ImprovementsJune 12, 2019 PDF (187 KB)
Ingrid Alverde


You should make sure you get all the permits you need before you start your project.  Some projects may trigger fees are upgrades that will cost money.

Ingrid Alverde
Close window
Feedback